THE FUTURE OF PILE DRIVING
IS MADE IN AMERICA
NASA, Wallops Island, VA.
148 ft. long concrete piles
with EMECA pile splices
OUR PRODUCTS
Emeca SPE USA produces pile splices for concrete piles and offers various different other services and products
for your concrete pile needs to save you time and money
PILESPLICES
Our most popular splices are
12”, 14”, 16”, 18”
and 24" square pile joints.
We can also provide our 8” and 10” Emeca splices with sufficient lead time. Read more about
OTHER ACCESSORIES
In addition our product range includes pile shoes, casting guides, locking pins and other accessories that will suit any concrete pile needs.
CUSTOM DESIGN
We can also customize our splices to specific size, shape and strength needed to meet required customer regulations.
ABOUT
Emeca SPE USA, found in 2008, manufactures steel pile splices for concrete piles. The Emeca splices allow splicing a full-length concrete pile in two or more segments which are easier, safer and more cost-efficient to ship and handle on the road and on the job site. Splices are permanently locked together with our patented locking parts and secured with locking pins. The installation process on the field takes approx. 3 minutes and the crew is ready to continue driving. Emeca has manufactured over 34,000 splices for various job sites across the country including NASA, Department of Transportations, hospitals and other civil engineering projects. These joints conform to the requirements of the International Building Code (IBC) and have also just got the Florida DOT certificate. Our joints are all manufactured in USA in our automated, state of the art facility located in Laurel, Delaware.
2008
Year Established
34,500
Splices used
3 min
Splice time
WHY US
Pile splices have been especially useful when facing these challenges on your construction site
Piles need to be driven longer than a standard truckable load (~55ft)
Jobsite is a low-overhead site
When driving battered piles
When driving battered piles
Pile handling logistic on the jobsite needs to go smoothly
Emeca splices can help you save valuable time and money. Emeca splices can be transported with just one truck, no complicated special transportation needed. Also logistics on the jobsite is easier and safer when working with shorter piles. When working with splices and purpose-build pile driving rigs, you would only need a crew of 2 people: 1 operator and 1 ground person. Smaller crews increase safety but also save money. Also in most areas of US, concrete is less expensive than steel, thus saving you money on piling materials.
FAST
New splice is prepared, secured and locked in place in just 3 minutes with Emeca splices.
STRONG
Our patented locking mechanisms ensure a reliable connection at the location of the splice. The splice is locked at all corners by steel pins that draw it into pre-compression. Connection is so strong that you can easily and reliably drive even accurate angled battered piles.
COST-EFFECTIVE
Use of Emeca splices will help save time and money. Installation of Emeca splices do not require welding, therefore logistics and on-site setup is much more efficient. Lower cost on the piling material could add up to tens of thousands of dollars or more on each project.
CONTACT
Inquiries
For any inquiries, questions or comments, please call: 302.875.0760,
send an email info@emeca-speusa.com or
fill out the following form
Manufacturing Facility
Get a quote: 302.875.0760
PROJECTS
Piling with 110 pc of 65-75 ft. piles to build reliable and sturdy foundation to lauch rocket ships to international space station
Almost 1'000 Emeca splices were used to build the parking garage for Disney terminals
Over 6'000 splices were used to build the massive foundation for the Seaport Canaveral Tank Farm